Build Virtual

BIM Coordination & VDC Services in Texas

I provide US-based BIM coordination, 4D construction animations, and VDC services to general contractors, developers, and pursuit teams building in Texas — from Austin and Dallas–Fort Worth to Houston and San Antonio. I coordinated the BIM model and provided the sleeve drawings on 600 Guadalupe, the tower that topped out as the tallest building in Austin at the time — and I bring that same coordination discipline to every Texas project, wherever in the state you're building.

With 10+ years in construction and VDC, including 4 years on-site, I run coordination the way a builder would — not just the way it looks in the model. 600 Guadalupe is part of $1.2B+ in construction value I've coordinated and visualized nationwide. You work directly with me: no offshore handoffs, no account managers, no telephone game.

Request an Estimate
600 Guadalupe, a 66-story tower in downtown Austin, Texas — BIM coordination and sleeve drawings by Build Virtual

Proof in Austin: 600 Guadalupe

600 Guadalupe is a 66-story, 865-ft residential and office tower in downtown Austin — roughly 2.2 million square feet of apartments, Class A office space, parking, and ground-floor retail. It's a $325M project, and it topped out as the tallest building in Austin at the time. I coordinated the BIM model for it — and provided the sleeve drawings that located its concrete penetrations before the pours, not after them.

A tower that size doesn't leave room for a clash to slip through. Dozens of trades — mechanical, electrical, plumbing, fire protection — all routing through the same structural core, floor after floor, with almost no margin for a duct or conduit run that doesn't fit the first time.

On a 66-story pour schedule, a sleeve drawing is the difference between a penetration placed in the formwork and a core drill through cured concrete.

That's the same coordination discipline I bring to every project — including the concrete lead-time practice I still use today: sign-off scheduled well ahead of each pour, so sleeves and block-outs are placed correctly before the concrete goes down, not corrected after it.

That's the experience Texas teams get when they bring me into a project — whether it's BIM coordination on a high-rise, a 4D animation for a pursuit, or a phasing plan for a bid package. 600 Guadalupe is public proof of the coordination side. The rest of what I bring to Texas projects is described below.

Building specifically in Dallas–Fort Worth or Houston? Each has its own page with market-specific context for your metro.

How I Work With Texas Teams

I'm based in Nashville, not Texas — and on a coordination or animation project, that's a non-issue. Here's what working with me actually looks like from Austin, Dallas, Houston, or San Antonio.

Remote-first, by design.

Every deliverable — models, clash reports, animations, phasing exhibits — moves digitally. I've coordinated and visualized projects across the country without living near a single one of them. Texas works exactly the same way.

Same time zone as most of Texas.

Nashville runs on Central Time — the same zone as Austin, Dallas–Fort Worth, Houston, and San Antonio. That means real-time answers during your actual work day, not an overnight hand-off waiting on a different clock.

Clear, real-time communication.

You're talking directly with the person coordinating your model or building your animation — not routed through a production queue or relayed through someone else. Questions get a same-day answer from someone who knows the project.

A live, active practice.

BIM coordination is a current service running today on active engagements — not a someday offering. The same standard Texas teams get from day one.

Services for Texas Construction Teams

Whatever stage your Texas project is at — pursuing the work or already building it — here's what I bring to it.

BIM Coordination & VDC Services

MEP clash detection, trade sign-offs, RFI management, and weekly deliverables — the same live coordination practice proven on 600 Guadalupe, available to any Texas GC or developer running an active project.

BIM Coordination & VDC Services · BIM Clash Detection Services

4D Construction Animations & Phasing Plans

For Texas pursuit teams: a 4D construction sequencing animation or an annotated phasing/logistics plan that shows a selection committee your plan instead of describing it — the same pursuit differentiator I build for GCs nationwide.

4D Construction Animations & Site Logistics Plans

3D-Printed Scale Models

A physical, 3D-printed scale model of the Texas project you're pursuing — printed from the real Revit/BIM model, handed to the committee as a leave-behind that stays on the table after the interview ends.

3D-Printed Scale Models

Software I Work In

  • Revit logo Revit
  • Navisworks logo Navisworks
  • AutoCAD logo AutoCAD

— the same Revit, Navisworks, and AutoCAD workflow, wherever your Texas project's models already live.

Frequently Asked Questions

Do you have BIM coordination experience in Texas?

Yes. I coordinated the BIM model for 600 Guadalupe — a 66-story, $325M tower in downtown Austin that topped out as the tallest building in the city at the time — and provided the sleeve drawings for its concrete penetrations. That's public proof of the coordination side of my Texas experience; see the full portfolio for the rest of my project history.

Are you based in Texas?

No — I'm based in Nashville, Tennessee, and I work with GCs and developers nationwide, including throughout Texas. Nashville runs on Central Time, the same zone as Austin, Dallas–Fort Worth, Houston, and San Antonio, so you get real-time answers during your actual work day, not an overnight hand-off.

Do you only work in Austin, or across Texas?

All of Texas. 600 Guadalupe is my named Austin project, but the coordination, animation, and scale-model services on this page are available to GCs and developers anywhere in the state — Dallas–Fort Worth, Houston, San Antonio, and beyond.

What Texas construction services do you offer?

BIM coordination and VDC services — MEP clash detection, trade sign-offs, RFI management, weekly deliverables — 4D construction animations and phasing/logistics plans for pursuits, and 3D-printed scale models as pursuit leave-behinds or project gifts.

How fast can you start on a Texas project?

It depends on the service — a 4D animation typically delivers in about 2 weeks, with a 1-week rush option for tight pursuit deadlines, and every inquiry gets a written estimate back within one business day. Tell me your deadline and I'll work to it.

Do you work with our existing BIM standards and coordination platform?

Yes. I can run your coordination program end to end or plug into your existing meetings, standards, and platforms — including Autodesk Construction Cloud (ACC), Navisworks, and Revit.

Have a Texas Project Coming Up?

Please take a moment to fill out the form — you'll hear back from me directly within one business day.